Welcome to the community
Simply ask, learn and share
cancel
Showing results for 
Search instead for 
Did you mean: 

Go Green Bolt On Terms and Conditions

These Go Green Bolt On product (“the Go Green Bolt On”) terms and conditions are between you and us:

  • You are the person who has subscribed to the Go Green Bolt On; and
  • We, Us, Our or ScottishPower is ScottishPower Energy Retail Limited, a company incorporated in Scotland with registered number SC190287 and having it's registered office address at 320 St. Vincent Street, Glasgow, Scotland, G2 5AD.

1. Go Green Bolt On

1.1 The Go Green Bolt On is the online subscription by you to 100% renewable electricity on any eligible ScottishPower tariff. For further information on tariff eligibility, see "Eligibility", below.

1.2 Supplies of 100% renewable electricity through the Go Green Bolt On are limited, by reference to the allocation process outlined in condition 4.3 below, and will be actively monitored by ScottishPower. The Go Green Bolt On will available until it is removed from sale by us.

2. Our Agreement

2.1 By accepting these terms and conditions, you agree to subscribe to ScottishPower’s Go Green Bolt On on the terms and conditions set out herein.

2.2 These terms and conditions are in addition to any eligible tariff terms and conditions and the ScottishPower Gas and Electricity General Terms and Conditions for Domestic Customers, which can be accessed at www.scottishpower.co.uk/legal/terms-and-conditions/.

3. Eligibility

3.1 You will be eligible for Go Green Bolt On if you meet the Eligibility Criteria set out below. You:

  • are an existing ScottishPower Domestic customer in receipt of an electricity supply;
  • manage your account online;
  • are not currently supplied on any Smart Green Electric Vehicle, Basic Fixed, Standard Variable, Basic Variable or Prepayment tariff;
  • comply with these terms and conditions, any eligible tariff terms and conditions and the ScottishPower Gas and Electricity General Terms and Conditions for Domestic Customers ; and
  • choose to subscribe to Go Green Bolt On through your online account.

4. Subscription

4.1 The Go Green Bolt On will commence on the first day of the next calendar month after the date that you subscribe.

4.2 Once you have subscribed, you will receive the Go Green Bolt On at a cost of £3 per month charged to your electricity account with ScottishPower after the Go Green Bolt On commences.

4.3 Ofgem issue a Renewable Energy Guarantee of Origin (REGO) certificate for every MWh of eligible renewable output to generators of renewable electricity in the UK. REGOs demonstrate that a given share of energy was produced from renewable sources. We'll match every MWh of electricity purchased on this tariff with a UK-sourced REGO certificate. Each REGO certificate shall be attributable to existing UK based renewable assets, including ScottishPower’s own installed capacity to generate over 2000MW of renewable energy per year. Based on the national average fuel mix for 2017-18, a UK consumer with medium typical domestic annual consumption of 3,100kWh of electricity will produce CO2 emissions totalling 713kg. As we will match your consumption with a UK-sourced REGO certificate, the annual C02 emissions under your tariff for electricity will be ZERO. You can access more information on government support for renewable supply, how electricity is physically distributed, and ScottishPower’s fuel mix.

4.4 The Go Green Bolt On will continue to apply as long as you are on supply for electricity with us  and you comply with the Eligibility Criteria, as set out above in condition 3.1. If you transfer to a new, eligible ScottishPower tariff, you can continue to receive the Go Green Bolt On. This does not affect your right to cancel the Go Green Bolt On at any time, in accordance with the "Cancelling the Go Green Bolt On" terms below.

5. Payments and Direct Debits

5.1 A charge of £3 will be added to your ScottishPower electricity account for each month that you are subscribed to the Go Green Bolt On.

5.2 The charge will be included as “Go Green Bolt On” in all future electricity bills from ScottishPower provided you remain on an eligible tariff. Your existing direct debit may be adjusted as a result of this additional payment and you will be notified in advance if this is the case.

6. Cancelling the Go Green Bolt On

6.1 You may cancel your subscription to the Go Green Bolt On at any time through your online account. Your electricity tariff will not be affected by any cancellation either by you or us.

6.2 Your subscription will terminate at the end of the calendar month in which you have instructed your cancellation. 

6.3 We will terminate your Go Green Bolt On subscription if your electricity supply transfers on to any Smart Green Electric Vehicle, Basic Fixed, Standard Variable, Basic Variable or Prepayment tariff.

6.4 If you choose to cancel your subscription to the Go Green Bolt On, you may subscribe at a later date to any Go Green Bolt On made available by ScottishPower, or re-subscribe to the Go Green Bolt On detailed in these terms and conditions, as long as you are on supply with us and provided you meet the relevant Eligibility Criteria.

7. Leaving ScottishPower or moving out of your property

7.1 If you leave the property to which the Go Green Bolt On applies, you will not be able to transfer this product to another property. However, you will be entitled to apply for any version of the product that is available when you move property.

7.2 You will continue to receive electricity and your Go Green Bolt On until the point that your switch to a new supplier takes place or you leave the property, providing you remain on an eligible tariff. After this point, we will stop charging you for your Go Green Bolt On. If you move house you need to give us at least 2 working days’ prior notice otherwise you will continue to be liable for the supply until either 2 working days after you do provide notice of the move or until a new owner or occupier enters into a contract for the supply.

8. Changes to these terms and conditions

8.1 We may change these terms and conditions at any time. We will update them on our website if we do.

8.2 If we make changes to these terms and conditions that are disadvantageous to you, we will inform you at least 30 days before they take effect. This does not affect your right to cancel the Go Green Bolt On at any time. Your electricity tariff will not be affected by any cancellation of the Go Green Bolt On.

8.3 We may:

  • terminate this contract or withdraw the Go Green Bolt On (or any part of it) by giving you 30 days' prior notice;
  • terminate our agreement with you with immediate effect if you breach any of your obligations under these terms and conditions; and/or
  • change the cost of the Go Green Bolt On. For any price increase, we will give you 30 days’ prior notice.

Updated by ScottishPower | 9 Apr 19

Labels: None

1 of 4 users found this helpful