Hi bandit. Lot of IHD problems right now, Not normal to wait 6 weeks but it could take a while. A bit of fobbing going on probably.
I had my Type 2 Smart meter installed on the 9th May 2019. The IHD links with the meters OK but the total cost of energy displayed (on a daily basis) seems quite high and the individual costs/consumption for gas and electricity seems to be reversed. i.e. I use far more gas than electricity but the costs (and consumption) displayed on the IHD look like they should be reversed because the reading for electricty is far higher than that of gas!
I phoned the HELP line (0800 027 0072) to try to get some answers and was told that it will take 6-8weeks for the IHD to start operating properly!
What the hell is the point of having a smartmeter / IHD installed if it doesn't work properly from day one? It's making me very nervous about what I might get billed at the end of the 6-8 week period.
You can ignore the costs on the Display, they have all gone wrong. It is definitely not your bill and only bad programming in the display’s internal calculations. The display is only accurate for meter readings and kWh data.
Thanks for the reply. Is that official? If so, what is SP planning to do to resolve the situation in "6-8 weeks". Are we likely to get new IHDs or are they just recycle-fodder? At the moment, the IHD is as useless as bits on a bull!
Don’t destroy the display, the pictures you showed gave good kWh data but wrong cost data. SP are going to send out a firmware upgrade to correct this. It was interesting your Smets2 IHD is now a new model with a colour screen. Now SP have two types issued I suppose it makes maintenance more difficult. OR. Did your installer give you a display for a different provider? Anything is possible. If SP replace the display it will need an engineer to visit and pair it with the meters.